Saturday evening, I installed our sprinkler timer. I’m very excited about the way this is coming together.
Sprinkler timer installed
August 8, 2010Dishwasher? Check!
July 22, 2010Sprinklers are nearly done
July 19, 2010This weekend, Crisha and I made a lot of progress on the sprinklers.
We built a manifold for the four valves that we’ll start with. We still need to run the funny pipe and drip irrigation and program the sprinkler timer. We hope to get the rest done in the next week or so.
We also mounted a garden hose on the fence. And, I was able to re-use a 1/2 in. shut-off valve, so that I can turn off all the sprinkler valves (should something go horribly wrong), while keeping the garden hose charged.
Bazinga!
One Year
July 19, 2010Yesterday, Crisha and I celebrated our One Year Anniversary.
I love you, babe!
new location
July 16, 2010I’m excited to say that this blog is moving to MarkAndCrisha.com.
I’m also hoping that Crisha and I will be a bit more active than I have been over the last … long while.
Sprinkler progress
July 14, 2010It was a little harder to start than I anticipated, but I’ve busted out most of the cement around the water bib next to the strawberry plants. I plan to install sprinkler valves and drip irrigation to water the vegetables and plants along this side of the house.
Yesterday, I was able to pull a string between the carport attic and the house attic, over the carport doors. I’m excited to be able to pull cables through there. I’m thinking about putting phone and maybe data ports in the carport closet, as well as pull a control line from the garage door opener into the house — and, of course, sprinkler lines from the controller in the laundry room out to the strawberries.
Cabling Photos
December 16, 2009I have uploaded some photos to Flickr (here) from our cabling projects: Preping for Network and Cabling Started, Worked Stopped.
Bye-Bye Bath Tub
December 16, 2009Our hall bath tub was rusted through. Of course, when you rip a tub out, you ruin the tile. So, we went ahead and ripped all of our tile out as well as the tub. In doing so, we revealed mold/mildew and water damage within the adjacent walls. Not an exciting discovery.
Gene, took all the tiles down over a weekend. I took all the cement down over three weeknights. And he and I both removed the tub and replaced the bad lumber on a Sunday afternoon. The new bath is yet to come.
Photos are on Flickr: here!
We have heat!
December 16, 2009After a couple tries, we finally were able to have SDG&E turn on our furnace on Dec 9th. But, it wasn’t until the evening of Dec 11th that we had any heat in the Guest Suite, where we’re living.
Photos are on Flickr: here!
Cabling Started, Work Stopped
November 17, 2009Sunday, Crisha and I started running cable. We had cable pulled for the first 3 rooms by the time Dan and Jesse joined us. At the end of the day, we had pulled about 460 feet of CAT 5e. We still have a few more drops to pull, but I’m not sure when we’ll get back to it.
I wasn’t feeling well on Monday. So, I left work after being there about an hour. I slept a bit, but I’m still not feeling 100%. Today, Crisha is feeling pretty bad. We think she may have strep throat and/or an ear infection. She has a doctor’s appointment, later this morning.





